Recently completed 600m of post and rail fence replacement to this car park. The original rotten fence was removed and posts extracted using a grapple attachment for our 8 tonne excavator. We then used a hydraulic post driving attachment to install the new posts. Rails were then fixed to the posts before moving onto the next area. Throughout this project we used our machinery with various attachments as much as possible to minimise the requirement for manual handling. Prior to driving all posts our operatives surveyed the area with a cable avoidance tool (CAT) to ensure there were no buried services present.
top of page
bottom of page
Comentários