Guildford- Ditch & Pond Clearance Thankfully the weather held out for us on this project clearing ponds and ditches at a site in Guildford. All silt was removed to a separate location meaning the SUDS system can once again operate at full capacity.
Thankfully the weather held out for us on this project clearing ponds and ditches at a site in Guildford. All silt was removed to a separate location meaning the SUDS system can once again operate at full capacity.
Comments