This project involved breaking up the tarmac, excavating and filling in preparation for the concrete. Formwork, steel reinforcing and movement joints were installed and the special 'Pav 2' heavy duty concrete was laid and floated to form a new 600m/2 yard area. Heavy duty Aco channels were installed to deal with surface water.