top of page


Case Studies
Search


Chessington World of Adventures- Wanyama Climbing Area
Well this was an exciting one to be involved with... what started as a tired/rotten meerkat enclosure has been transformed into a new...


Lyne, Chertsey- Concrete Parking Area
This project involved forming a new concrete parking area for offices. Having removed the existing cracked concrete, installed a new sub...


Chessington World of Adventures- Vet Building External Surfacing & Drainage
Today we say goodbye to ‘Lee’s Lake’ and hello to the new fit for purpose tarmac road and pathways. With new drainage installed and some...


Roehampton- Drainage Project
Works involved installing attenuation tanks to an existing drainage system to provide additional storage and increase capacity for when...


Newdigate- Patio and Fencing
That’s another patio and fencing project completed in Newdigate. This time an autumn Indian sandstone patio with a hit and miss fence to...


Ripley- Closeboard Fencing
150m of 6ft high closeboard fencing. With concrete posts and gravel boards this fence will stand the test of time.


Walliswood- Access Pathways
After a previous very wet winter our client wanted to create some access pathways so that their alpacas could move between paddocks and...


Guildford- Ditch & Pond Clearance
Thankfully the weather held out for us on this project clearing ponds and ditches at a site in Guildford. All silt was removed to a...


Jacobs Well- Lawn and Patio
Another landscaping project completed in Jacobs Well. First the removal of an unused tarmac area, replaced with a new turfed lawn, new...


Bookham- Patio
The existing patio was taken up and a new retaining wall formed with a step down to the garden. Fortunately our micro machinery is small...


Jacobs Well- Patio
What started as an area of wasted overgrown space has now been transformed into a contemporary oasis of calm. New rendered blockwork...


Chessington World of Adventures- Rainforest Land
This was an exciting task that took 4 months to create a themed rainforest land that included 3 new attractions. The project also...


Chessington World of Adventures- Elmers Flying Jumbos
We were tasked with relocating Jumbo elephants to the rear of the gift shop at Adventure point. To make life difficult we had to remove...


Maidenhead- Cafe Groundworks
This involved the foundations, services and surfacing for a new cafe at a business park. Works also involved forming 4 new parking spaces...


Newdigate- Tanked Permeable Driveway
A planning condition meant our client had to have a system constructed that would create a holding area within the driveway for rainwater...


Chiddingfold Driveways
We were tasked with creating a new driveway for 2 opposite properties, thankfully both clients had the same taste and selected granite...


Chessington World of Adventures- Explorer Car Park Project
This project involved improving the existing made up even tracks to provide a new fit for purpose car park for the use of the guests...


Haslemere- School Improvement works
Following flooding to the artificial pitches we were instructed to install new surface water drainage and alter the layout of the road...


Leatherhead- Entrance improvement works
Works involved breaking out the existing slabs and lights, replacing manhole covers, installing new lights and relaying new slabs and...


Esher- Groundworks for rear & side extension
85 m/2 domestic extension in Esher. The client had a Thames Water drain that served several other houses located within the proposed...